  1. Here is a similar example completed in 1971:
    http://en.wikipedia.org/wiki/Lowry_Tunnel
    It is I-94 through downtown Minneapolis. It includes at least three buildings within 100′ of the center line, and ROW is likely tighter than that. Buildings are not any closer to the center line of the Lowry Tunnel due to the right of way required by the two surface arterial roads that intersect here (and also because some of the buildings pre-date the tunnel).

    I would be interested to understand the valid limitations expressed by TxDOT. It’s not hard to believe that the Reconnect Austin envisioned graphically thus far will require some modifications due to real engineering constraints. However, since I’ve seen working examples elsewhere, it’s impossible for me to deny that Reconnect Austin’s general vision is indeed feasible, engineering-wise.